top of page
Aeroasia Experience
Donate
Why choose us?

Rapid Wastewater Treatment Plant Installation
Install your STP in just 1-2 weeks— faster than traditional months of setups. Save time, reduce delays.

Fast Sewage Treatment Process and Minimal Noise
Process wastewater in just 15–30 minutes with our high-efficiency STP system. Only 20-25 db of operation noise.

Maximize ROI with Lower STP Operating Costs
Cut up to 75% on sewage treatment plant operating expenses. Boost savings with efficient wastewater technology.

Space-Saving Sewage Treatment Plant Design
Only <32 sqm needed vs. 200 sqm for conventional systems (based on 500 CMD). Maximize property usage.

Easy Environmental
Compliance with DAO
2016-08& 2021-19
Smart, low-maintenance STP solution designed to meet DENR wastewater regulations.
bottom of page